{"id":1519,"date":"2023-12-20T14:39:05","date_gmt":"2023-12-20T06:39:05","guid":{"rendered":"https:\/\/www.cyclewell.com\/en\/?p=1519"},"modified":"2023-12-20T14:39:06","modified_gmt":"2023-12-20T06:39:06","slug":"the-integrated-project-of-power-battery-recycling-of-cyclewell-has-started","status":"publish","type":"post","link":"https:\/\/www.cyclewell.com\/en\/news\/1519.html","title":{"rendered":"The integrated project of power battery recycling of CycleWell has started!"},"content":{"rendered":"\n<p>On October 29, 2023, the groundbreaking ceremony of the integrated power battery recycling project was held at the project construction site.<\/p>\n\n\n\n<p>The project is the first batch of signed projects in Ganzhou Economic and Technological Development Zone, with a total investment of 2 billion yuan.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1000\" height=\"750\" src=\"https:\/\/www.cyclewell.com\/en\/wp-content\/uploads\/2023\/12\/2023122006383491.jpg\" alt=\"\" class=\"wp-image-1520\" srcset=\"https:\/\/www.cyclewell.com\/en\/wp-content\/uploads\/2023\/12\/2023122006383491.jpg 1000w, https:\/\/www.cyclewell.com\/en\/wp-content\/uploads\/2023\/12\/2023122006383491-300x225.jpg 300w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p>The integrated project covers an area of 112 acres, with a planned total construction area of 140,000 square meters, including raw material warehouse, finished product warehouse, production workshop, wastewater recycling center, R&amp;D building, office building and other buildings.<\/p>\n\n\n\n<p>The project obtains a formal construction permit after passing the approval procedures such as project approval, planning permission, energy assessment and approval, and environmental impact assessment and approval. Sekowell will do a good job in project design and construction with high standards and strict requirements, and it is expected to be completed and put into operation in the second half of 2024.<\/p>\n\n\n\n<p>The project adopts the SPR technology independently developed by Secowell to realize the full element recycling of lithium iron phosphate waste. Sekowell will make every effort to build a green factory, a zero-carbon factory and a smart factory for power battery recycling.<\/p>\n\n\n\n<p>With the support of its own core technology, Secwell continuously integrates technology, equipment, production and services, and actively contributes to the potential of urban mines, the construction of &#8220;zero-waste cities&#8221; and the realization of the &#8220;double carbon&#8221; goal.<\/p>\n\n\n\n<p>Looking forward to the future, Sekowell will, as always, practice the business philosophy of &#8220;guarding lucid waters and lush mountains, developing gold and silver mountains&#8221;, and deeply cultivate the new energy track with business partners with solid and excellent technology and win-win cooperation attitude, so as to create a better future for mankind!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On October 29, 2023, the groundbreaking ceremony of the integrated power battery recycling project was held at the project construction site.<\/p>\n","protected":false},"author":1,"featured_media":1520,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[23],"tags":[],"_links":{"self":[{"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/posts\/1519"}],"collection":[{"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/comments?post=1519"}],"version-history":[{"count":1,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/posts\/1519\/revisions"}],"predecessor-version":[{"id":1521,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/posts\/1519\/revisions\/1521"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/media\/1520"}],"wp:attachment":[{"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/media?parent=1519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/categories?post=1519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cyclewell.com\/en\/wp-json\/wp\/v2\/tags?post=1519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}